Professional China Synthetic Graphite Sheet – Synthetic Graphite Powder &Graphitized Petroleum Coke (GPC) – Sungraf Detail:
Products Details
The product is made of carbon materials so it has low ash,low sulphur and low Nitrogen,It is widely used in Foundry Industry ,steel-smelting industry,friction materials,etc.
The Specification of Synthetic Graphite:
Index/NO. | Purity | Partical Size | Real Density | Moisture |
(%) | (%) | (g/cc) | (%) | |
Synthetic Graphite | 99% | 1-5mm/2-4mm/5-10mm | ≥2.2 | ≤0.3 |
RZ-U1 | ≥99 | D80=75μm | ≥1.8 | ≤0.3 |
RZ-U2 | ≥99.4 | D50=16-20μm | ≥1.8 | ≤0.3 |
RZ-U3 | ≥99.4 | D50=10-15μm | ≥1.8 | ≤0.3 |
RZ-U4 | ≥99.4 | D50=5μm | ≥1.8 | ≤0.3 |
The Specification of GPC:
Brand No. | F.C% Min | Ash% Max | Volatile% Max | Moisture% Max | S% max | N(PPM) | Size |
RZ-SY-01 | 99.5 | 0.2 | 0.3 | 0.5 | 0.01 | 80 | 0-0.20.2-1mm
1-5mm 2-5mm 5-10mm |
RZ-SY-02 | 99.2 | 0.3 | 0.5 | 0.5 | 0.02 | 100 | |
RZ-SY-03 | 99 | 0.5 | 0.5 | 0.5 | 0.03 | 200 | |
RZ-SY-04 | 98.5 | 0.8 | 0.7 | 0.5 | 0.05 | 300 | |
RZ-SY-05 | 98 | 1.5 | 0.5 | 0.5 | 0.5 | 500 | |
Note:The carburizer Chemical compositions and sizes can be adjusted if requiredPacking:One ton bag or 20kgs/25kgs PP bags;to be adjusted. |
Product detail pictures:
Related Product Guide:
Our company puts emphasis on the management, the introduction of talented personnel, and the construction of staff building, trying hard to improve the quality and liability consciousness of staff members. Our company successfully attained IS9001 Certification and European CE Certification of Professional China Synthetic Graphite Sheet – Synthetic Graphite Powder &Graphitized Petroleum Coke (GPC) – Sungraf , The product will supply to all over the world, such as: Qatar, Curacao, Paraguay, We are increasingly expanding our international market share based on quality products, excellent service, reasonable price and timely delivery. Please contact us at any time for more information.
By Elva from Israel - 2018.11.28 16:25
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Nicci Hackner from Bandung - 2018.02.12 14:52